
Sunfield Building 2
The Sunfield Building 2 Project included tilt walls, piers, slab on grade, concrete paving, loading docks and ramps, curbs, and sidewalks.

The Sunfield Building 2 Project included tilt walls, piers, slab on grade, concrete paving, loading docks and ramps, curbs, and sidewalks.

The FedEx Express project included Tilt Wall, Driven Piles, Slab on Grade, Conveyor Platform, Concrete Paving, Loading Docks, Curbs and Sidewalks.

The Stone Hill Panera Project included tilt wall, slab on grade, and concrete paving.

The Oakmont Project included tilt wall, slab on grade, concrete columns, and concrete paving.

The Natural Vitality project included tilt wall, slab on grade, slab on metal deck, and concrete paving.

The LA Fitness project included tilt wall, slab on grade, interior pool deck edge, and concrete paving.

The Fat Quarter project included tilt wall, slab on grade, slab on metal deck, concrete paving, and site retaining walls.

The Life Storage Project included 4 Story Tilt up, Slab on Grade, Slab on Metal Deck, and Concrete Paving.

The Del Valle High School Project included Concrete Hollowcore Foundation Systems, (Concrete Piers with Exposed Concrete Pilasters, Concrete Beams and Concrete Topping Slabs Over Hollowcore Planks) Concrete Piers and Foundation For Athletics Building With In-Door Sports Field, Elevated Slabs on Metal Decks, Sidewalks, Concrete Paving, Decorative (With Recessed School Logo) Cast-In-Place Concrete Site Wall.

The Del Valle High School Project included Concrete Hollowcore Foundation Systems, (Concrete Piers with Exposed Concrete Pilasters, Concrete Beams and Concrete Topping Slabs Over Hollowcore Planks) Concrete Piers and Foundation For Athletics Building With In-Door Sports Field, Elevated Slabs on Metal Decks, Sidewalks, Concrete Paving, Decorative (With Recessed School Logo) Cast-In-Place Concrete Site Wall.

The Del Valle High School Project included Concrete Hollowcore Foundation Systems, (Concrete Piers with Exposed Concrete Pilasters, Concrete Beams and Concrete Topping Slabs Over Hollowcore Planks) Concrete Piers and Foundation For Athletics Building With In-Door Sports Field, Elevated Slabs on Metal Decks, Sidewalks, Concrete Paving, Decorative (With Recessed School Logo) Cast-In-Place Concrete Site Wall.

The Del Valle High School Project included Concrete Hollowcore Foundation Systems, (Concrete Piers with Exposed Concrete Pilasters, Concrete Beams and Concrete Topping Slabs Over Hollowcore Planks) Concrete Piers and Foundation For Athletics Building With In-Door Sports Field, Elevated Slabs on Metal Decks, Sidewalks, Concrete Paving, Decorative (With Recessed School Logo) Cast-In-Place Concrete Site Wall.

The Del Valle High School Project included Concrete Hollowcore Foundation Systems, (Concrete Piers with Exposed Concrete Pilasters, Concrete Beams and Concrete Topping Slabs Over Hollowcore Planks) Concrete Piers and Foundation For Athletics Building With In-Door Sports Field, Elevated Slabs on Metal Decks, Sidewalks, Concrete Paving, Decorative (With Recessed School Logo) Cast-In-Place Concrete Site Wall.

The Del Valle High School Project included Concrete Hollowcore Foundation Systems, (Concrete Piers with Exposed Concrete Pilasters, Concrete Beams and Concrete Topping Slabs Over Hollowcore Planks) Concrete Piers and Foundation For Athletics Building With In-Door Sports Field, Elevated Slabs on Metal Decks, Sidewalks, Concrete Paving, Decorative (With Recessed School Logo) Cast-In-Place Concrete Site Wall.

The Chip Semi Conductor Project included tilt wall, slab on grade, slab on metal deck, concrete paving, pond structures and site retaining walls.

The Colinas Crossing Project included Concrete Slabs on Grade, Board-Formed (Using Natural Wood) Concrete Tilt Panels, Curb and Gutter, Sidewalks, Detention Pond Concrete Walls, Cast-In-Place Board Formed (using Natural Wood) Concrete Planters.